Summit YMCA

zzzz

  • Summit Area YMCA Pool and Gym Addition and Interior Renovations
  • 22,000 SF addition and Renovation.
  • The addition consisted of a new competition pool, gymnasium, aerobic and child care area’s.
  • The renovation included demolition of the existing locker room. Lowering the floor slab. New locker rooms, updating the existing pool, main lobby and converting the old gym into a fitness area.
  • Project was completed while the YMCA was open to the public.